| Articles |
| 2008 |
| |
November |
BP Atlantis Supplement |
Rodney Bennett |
| |
June |
World Oil |
"New Completion Technology Improves Ultimate Oil Recovery"
Magdi Elasmar |
| |
January |
Offshore |
"Extreme Wells: Challenge for HPHT Completions"
Kirk Huber (a) |
| 2007 |
| |
September |
JPT |
"New Opportunities for Time-Sensitive Gulf of Mexico Opportunities"
Allen Womble, Ed Van Sickle, Mike Mckown |
| |
September |
The Expandable Technology Forum (ETF) Newsletter |
"Cased-Hole Clad Provides Operational and Economic Advantages"
Eddie G. Bowen |
| |
July |
Drilling Contractor |
"HPHT Operations Pose Escalating Challenges for Operators, Suppliers" |
| |
April |
The American Oil & Gas Reporter |
"A Perfect Fit for Ultradeep Water"
Ricardo Tirado |
| |
March |
JPT |
"Ultradeep HP/HT Completions: Classification, Design Methodologies, and Technical Challenges" (synopsis from OTC 17927)
B. Maldanado, A. Arrazola, B. Morton |
| |
February |
Hart's E&P |
"Together We (Should) Stand"
Rustom Mody |
| |
January |
Drilling Contractor |
"Overcoming the Loss of a Primary Barrier in an HPHT Well - Investigation and Solution"
R. Ross |
| 2006 |
| |
January |
Hart's E&P |
"Technologies Make Winner Out of Field" |
| 2005 |
| |
November |
Oil & Gas Vertical |
"Baker Oil Tools on shelf of Black Sea" |
| |
October |
Hart's E&P |
"High risks demand high tech"
Omar Mohammed, Rustom Mody, Todd Broome |
| |
October |
Drilling Contractor |
"Special design strategies vital as HPHT completions edge toward 500F, 30,000 psi"
Bernardo Maldonado |
| |
September |
Hart's E&P |
"Shutting off water, smartly"
Ricardo Tirado |
| |
September |
World Oil |
"What’s new in production" |
| |
July |
Roustabout |
"New Reservoir Control Valve System reduces ESP workover cost and formation damage risk"
Ray Chavers |
| |
April |
JPT |
"Managing the Tradeoffs: Similarities Between Managing New Product Development and Managing a Well Drilling/Completion Project"
B.S. Shaw |
| |
March |
Offshore Engineer |
"Perfless' completion in prospect" |
| |
February |
JPT |
"Cased-hole completions without perforating eliminate risks" |
| 2004 |
| |
February |
Oil & Gas Journal |
"New downhole technologies tackle multifacteted environments"
Guntis Moritis |
| 2003 |
| |
December |
Offshore |
"Well recompletion with ESP triples production for deepwater well"
Randy McEntire, Sripriya Pulipaka |
| |
July |
The American Oil & Gas Reporter |
"Factors Crucial in HP/HT Completions"
Don Ingvardsen, Walt Chapman |
| |
May |
Argentina Petroleum & Gas Institute Publication |
"Advanced well completions, a note for the IAPG Houston Chapter"
Rene Casarsa |
| |
April |
Offshore |
"Continuity, communication key in success of HP/HT projects"
Mark McCasland, Tom Luce |
| |
January |
Offshore |
"High-Tech Wells Publication" |
| |
January |
OGJ |
"High-Tech Wells Publication" |
| 2002 |
| |
October |
Hart's E&P (Nansen/Boomvang, Kerr-McGee Supplement) |
"Completion Tools, Stimulation Services Contribute to Successful Projects"
David Cundiff |
| |
April |
Offshore Engineer |
"Technologies for tomorrow" |
| 2001 |
| |
November |
Offshore |
"Technical Limits Approach Slashes Completions Costs by 50%"
James King |
| |
May |
Hart's E&P |
"Production Challenges and Solutions"
Jack Angel |
| 1999 |
| |
December |
Offshore |
"Acoustic Telemetry Gaining Efficiency"
Kevin McMillin |
| |
November |
Offshore Engineer |
"Nova Scotia Starts Cooking With Gas (Sable Islands)"
Rick VonFlatern |
| |
July |
Oil & Gas Journal |
"Fiber Optics, Advanced Technology Complete ERD Producer/Injector"
Russell Miller |
| 1998 |
| |
October |
JPT |
"Deepwater Remotely Actuated Completions for the 21st Century"
Mike Smith, Evan Lowe, Craig Coull |
| |
August |
Hart's Oil & Gas Investor |
"Completion Technology" |
| |
March |
JPT |
"Completion Design for Downhole Water and Oil Separation and Invert Coning"
Arthur Loginove |
| |
January |
Roustabout |
"Single-Trip Technologies Bridge Today's Needs with Tomorrow's Solutions"
Dean Fanguy |